Project: KMYARV12     -     Entry

Nov 29, 2021 9 Productive week Category: Workshop
Larry was out with Covid but the team labored on without him this week!
The cowling top was fitted preliminarily. The lower cowling HS been rough trimmed.
Final check of the cockpit revealed a bottomed-out nut on the stabilator pulleys. The bolt was cut out and appropriate washers were used in the reinstall.
Fuel tank wiring was completed.
Tonight the tailcone was attached with clecos and the rudder cables were pulled back and attached. Brady set the forward attach links so that the pedals are even and there is adequate tension.
Harsh continues to work on the avionics bay.