Project: KMYARV12     -     Entry

Dec 12, 2021 3 Slow progress Category: Workshop
Garrett continued to work on the Flaperon torque arms and tubes. Preliminary holes were drilled and he reinstalled the parts. When reinstalled the flaperons were drooping 1/4"-1/2" down slightly more on the R than the L. Not being sure if this was OK we discussed ways of correcting the asymmetry. Larry discussed the issue with Van's Monday morning and it sees this is fine. If we can correct some asymmetry with final hole drilling that would be OK, but final rigging adjustments will be made by lengthening or shortening the long push rods from the sticks.
Adam and Richard worked on the upper cowling, drilling the attachment holes along the aft hinge.
Maggie worked to bend the flanges on the tailbone.
Addison worked on the sideskin pieces, attaching nut plates.
Willem vacuumed the hanger (yeah!) and Logan helped him remove stables from one of the crate plywood covers.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.