Project: mhlRV14A     -     Entry

Apr 21, 2024 0.5 25-06 - Bulkhead Reaming Category: 25 Mid-Fuse
Final Prep (Dimple, Countersink, and Shape)
04/21/24 – 0.5h
The final step in this section is to ream a handful of holes from the forward and aft center bulkhead assemblies through bulkhead webs and side angles. The instructions laid out a specific process to complete this task, which worked well. My only addition to the procedure was to use a Drill Guide to help ensure no side loads on the holes during the reaming process.
[.311 Reamer, .375 Reamer, Drill Guide]


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.