Project: phowe     -     Entry

Jul 12, 2021 6 Cage to tail-cone work Category: Fuselage
After struggling with the text, parts, and figures manuals (all the related parts etc are in multiple sections). We cut and all the related strengtheners, Top, bottom, and sides. Match drilled with the tabs on the cage. We cut the middle and bottom longeron strengthners and match drilled the middle longeron and clecoed in place. Ended the day trying to figure out the best way to attach the bottom strengthener.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.