Project: phowe     -     Entry

Dec 07, 2021 4 Boot Cowls Category: Fuselage
Spent a lot of time with the fit of the boot cowl skins, spacers, and the firewall. The instructions were incorrect all the spacers were precut to the correct length and predrilled. we did have to keep flipping them over to figure out the best fit on these spacers. We match drilled all holes to #40.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.