Project: RANS21RB     -     Entry

Apr 15, 2021 2.5 Vertical Stab Category: Empennage
Removed clecos, cleaned and deburred the match-drilled holes in the front spar, leading edge skin and side skins. Clecoed skins back on, aligned surface and began pulling rivets on side skin.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.