Project: RANS21RB     -     Entry

Apr 27, 2021 4.3 Horizontal Stabilizer Category: Empennage
Removed all clecos and deburred spar holes that were match drilled. Drilled stab tips for install. Clecoed inspection covers reinforcement rings.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.