EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
- Entry
Date:
May 16, 2021
Hours:
6.7
Elevator
Category: Empennage
Description:
Match drilled and clecoed trim tab. Riveted trim tab together. Clecoed bottom skin on elevator. Aligned and measured trim tab hinges. Drilled and clecoed to elevator and tab.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.