EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
- Entry
Date:
Aug 15, 2021
Hours:
2.6
Left Wing Build-Up
Category: Wings
Description:
Measured and drilled required holes for tank fittings left wing fuel tank. Cut cap opening with 3" hole saw (not a fly cutter). Fished fittings in tank with safety wire as suggested in the plans and RANS video on same subject.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.