Project: RANS21RB     -     Entry

Aug 16, 2021 1.5 Left Wing Build-Up Category: Wings
Measured and drilled left fuel tank for gas cap flange. Tightened fuel sight gauge and fuel pickup fittings- used blue Loctite.
Drying overnight before installing remainder of those fittings.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.