Aug 25, 2021 2.0 Left Wing Build-Up Category: Wings
Removed screws in cap and reinstalled (one by one) with Fuel Lube thread sealant. Blew up balloon and attached to rear fuel fitting for pressure testing. Sprayed soapy water on fittings- no leaks noted and it appeared to hold pressure after about 2 hrs. Drilled out fuel vent fitting.