Project: RANS21RB     -     Entry

Aug 28, 2021 1.7 Right Wing Build-Up Category: Wings
Verified proseal setup around fuel cap. Removed wing from worktable to wing stand. Setup worktables for right wing spars. Collected truss and mounting hardware. (Front and rear spar on right wing were previously prepped with doublers and spar attach fittings installed. Also, I previously drilled and mounted the strut attach fittings and mounted them to the truss).


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.