Project: RANS21RB     -     Entry

Sep 05, 2021 4.5 Right Wing Build-Up Category: Wings
Completed install of serated grommets on ribs 1 and 2. Glued with superglue. Checked wing for twist and racking and verified root and tip were equal angles. Clamped wing. Laid stringers in position. Clecoed top skin and match drilled all holes in skin to front spar. Sanded long surface scratch in skin near LE.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.