Project: RANS21RB     -     Entry

Sep 22, 2021 3 Right Wing Build-Up Fuel Tank Category: Wings
Attached remainder of fuel tank fittings with EZ Turn Fuel Lube. Removed screws from cap flange and reinstalled with EZ Turn. Vacuumed out tank. Pressure tested with balloon. Installed tank in wing. Clecoed root rib.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.