EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
- Entry
Date:
Nov 11, 2021
Hours:
3.5
Baggage floor supports and tailcone spacer strips
Category: Fuselage
Description:
Match drilled S3 S4 baggage floor supports to lower longerons. Drilled and clecoed bottom and lower side tailcone spacer strips to cage tabs and stringers.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.