Marked landing gear holes bolt holes to be drilled on bottom skin. Trimmed side skins at various points to fit. Remarked and measured underside of bottom skin for tube clearance. Laid out rivet lines on side skin flanges. Marked and drilled to #40 pilot holes. Reinstalled bottom skin to prep for match drilling side skin flanges to bottom skin.