Project: RANS21RB     -     Entry

Dec 28, 2021 4.5 Bottom skin and forward side skins Category: Fuselage
Marked landing gear holes bolt holes to be drilled on bottom skin. Trimmed side skins at various points to fit. Remarked and measured underside of bottom skin for tube clearance. Laid out rivet lines on side skin flanges. Marked and drilled to #40 pilot holes. Reinstalled bottom skin to prep for match drilling side skin flanges to bottom skin.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.