EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
- Entry
Date:
Jan 29, 2022
Hours:
4.5
Brake cylinders and elevator push pull tube
Category: Controls
Description:
Drilled control sticks for PTT and Trim wires. Installed rubber grommets. Assembled brake cylinder assemblies onto rudder pedals. Pre installed all hardware.
Assembled front elevator push-pull tube with all hardware and bearing fabrication.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.