Project: RANS21RB     -     Entry

Feb 21, 2022 3.5 Cockpit Category: Fuselage
Installed floorboard. Installed rudder pedal assembly. Greased control stick assembly bearings and tightened assembly. Installed control stick assembly to floorboard. Installed elevator torque tube through fuselage.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.