EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
- Entry
Date:
Jun 23, 2022
Hours:
2
Wheels and Brakes
Category: Landing Gear
Description:
Installed tube in second tire. Packed all wheel bearings with Mobil 28 aircraft grease. Assembled 2nd brake assembly. Torqued wheel and disc hardware.
Both wheels ready to assemble onto gear legs.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.