Secured cabin heat cable to firewall with adel clamp. Need one additional clamp. Assembled hardware to secure cable to heater box. Re-clocked actuator arm. Torqued all engine mount to airframe nuts. Used high temp locking nuts. Removed powder coating on mount lug that has engine ground cable. Spent rest of time sorting out and mounting all engine hardware bags to parts board in preparation for engine install next week.