Project: RANS21RB     -     Entry

Oct 15, 2022 4.5 Controls Category: Firewall
Rerouted cabin heat cable. Installed oil cooler assembly. Terminated avionics ground wires. Extended USB power and ground wires to center console. Fabricated engine ground wire and installed. Temporarily hooked up battery plus and minus to master solenoid to test master switch and avionics on main battery power. All worked normally.

No Pictures found for this entry