Routed EGT and CHT wires to respective sides of engine. Terminated LSE manifold pressure line to 'T' fitting that splits line to each LSE ignition box. Re-aligned cylinder #4 fuel injection line and modified adel clamp mount at top of case to allow room for spark plug wires at coil packs.