Marked and drilled/deburred exhaust stacks for EGT probes. Needed to drill out to #29 drill size for perfect fit of probes. Clamped probes and trimmed hose clamps. Wired probes to appropriate leads and tested readouts on G3X. All readings normal. Applied heat to stacks with heat gun and all responded correctly. Finished fabricating airbox inlet tabs. Ready to install.