Project: RANS21RB     -     Entry

Jan 07, 2023 3.5 Prop flange and spinner Category: Engine
Finished fabrication of coanda fairing for base of firewall. Drilled holes and mounted fuel pump overflow and engine breather hoses in fairing with grommets. Temporarily attached prop flange, spinner backplate and prop hub plate for upcoming fitment of cowling. Prop is Whirlwind 80" STOL prop. Retightened all screws on ignition box d-sub connectors.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.