Project: RANS21RB     -     Entry

Mar 27, 2023 4 Cowling Category: Engine
Located and drilled remaining Southco receptacle locations for riveting. Enlarged center holes to 1/4" on cowling and 9/32" on joggle and boot cowl attach strip. Counterbored rivet holes. Riveted receptacles in place. Need 2 more receptacles because I added an additional receptacle on each bottom flange of the lower cowling- plans only showed one at that location.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.