Project: RANS21RB     -     Entry

Apr 12, 2023 3.5 ABS Fairings Category: Fuselage
Finished rough cutting of all the ABS fairings with a dremel cutoff wheel. Drilled required openings in elevator trim and tailwheel cable fairings. Mounted elevator trim fairing. Printed Figure 06-19 to 1:1 for template for Lift strut fairing. Will cutout tomorrow.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.