Project: RANS21RB     -     Entry

May 09, 2023 2.5 Horizontal Stab fairing Category: Empennage
Drilled and installed all nutplates in horizontal stab for the stab to fuselage faring. Started install of wingtip strobe/nav lights. Measured tip for drilling.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.