Project: RANS21RB     -     Entry

Jun 05, 2023 2 Main Gear Category: Landing Gear
Hoisted front of fuselage to take weight off gear legs. Removed both AN 5 bolts from main gear leg attachments. Straightened plastic rub strip (it was not aligned properly during initial installation- my error). Replaced all 4 AN5 boltsnuts with new and retorqued to build manual values. Applied torque seal to nuts. Retorqued both AN6 main bolts.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.