Project: RANS21RB     -     Entry

Jan 23, 2024 3.5 Stab fairing Category: Tail Feathers
Marked and drilled Aerosport Vertical Stab base fairing per drawing. Transfered to Stab and fuselage for rivnut install. Deburred holes and installed #8 RIVNUTS using red Loctite. Moved right wing from rotator to storage stands.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.