Project: RANS21RB     -     Entry

Feb 28, 2024 3 Wiring and paint prep Category: Interior Finish
Applied acid etching to all inspection panels and fairings. Rinsed thoroughly with water. Plan to prime and paint white tomorrow. Continued to wire wing lighting and power/ground wires at Station 3 terminal blocks. Ops checked landing lites and nav/strobe lights. All operating normally. Still need to tidy up wiring . Rerouted flap teleflex cables to final location.