Project: RANS21RB     -     Entry

Mar 06, 2024 1.5 Horizontal and Vertical Stab Mounting Category: Empennage
Mounted horizontal stab. First snugged up incidence adjusters on front to lowest setting per manual for the Titan 340. Leveled stab with wings visually. Made slight adjustment to raise right incidence adjuster a very small amount. Tightened socket screws and used blue loctite. Placed 2 AN970-4 large washers between rear spar and rear mounting bolts to take up gap. Drilled and reamed left rear mount bolt and torqued all mount bolts. Horizontal stab is final mounted. Assembled rudder to Vertical Stab using proper hinge bolts which were tightened. Installed vertical stab/rudder combo in fuselage. Temporarily attached Vertical stab using 2 bolts. Will finish installing all bolts next session.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.