Project: RANS21RB     -     Entry

Mar 15, 2024 1 Elevator and Vertical Stab fairing Category: Reassembly
Trimmed rear edges of vertical stab fairing and checked fit. Installed elevator and tightened hinge hardware. Ready to wire trim tab motor and attach elevator push pull tube.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.