Project: N524JL/N87JL     -     Entry

Aug 10, 2021 5 Trailing edge time Category: Empennage
I started the trailing edge by taping the 3M tape to both sides of the wedge and leaving it to cure. I then followed the directions in section 5 and thankfully got it so the tape was stuck to both skins and the wedge. I then clecoed everything to a piece of aluminum angle that was previously drilled and let it set for about 4 days to cure (4 days because I had other things going on). I removed the angle, double flush riveted according to section 5 and using the angled dies from Cleveland for the pneumatic squeezer. Maybe not perfect but I think it will work. Onto the leading edge.