Apr 04, 2021 4.5 9-7(L): Left elevator priming Category: 9: Elevators
I decide to go forward with just one elevator at a time with intent of getting one a few days ahead of the other to stagger the proseal work.

Not a lot of photos today, but a ton of work. Most of it was the less glamorous part of building. Took apart the cleco'd elevator and deburred all of the holes. Then clean and etch in preparation for priming.

Priming is getting better. Very happy with the results, but also getting much better at getting good coverage without wasting paint. Everything came out great and I finally took a break to take a photo.