May 30, 2021 1.5 10-11: Longeron drilling Category: 10: Tail Cone
Clamped and drilled the longerons. Just a lot of holes but not too bad. I went ahead and drilled to #40s, not the 3/32” called in the plans since the hole in the skin is already #40 and there will be no additional final drill step later. My bends worked well and had no trouble achieving the alignment with the skins.

Got to skip most of the other steps in this section since everything is already final sized. It would have taken many hours to final drill all of the skins. Thanks Van's!