Project: Greg's_RV-10     -     Entry

Jun 24, 2021 2.8 10-20: Still tailcone riveting and static system Category: 10: Tail Cone
Took a break for wisdom teeth removal. Was a little depressed to not get to work on the airplane but felt much better this morning after pounding a few rivets.

Got another couple hours in after work. Got through all of the left side stiffeners and started on the left bulkheads. Was able to back rivet those to try to keep them tight against the skin. Some are tucked under the j channel stiffeners and very tough to get to though.

Looking ahead at installing static ports and realized I should just do all of the static plumbing now before the top skin goes on. Ordered lines and fitting and some hardware.

Purchases: Steinair: static lines, fittings; ACS: nut plates, adel clamps, screws, snap bushings