Project: Greg's_RV-10     -     Entry

Apr 11, 2022 1.9 17-3: Finish left LE Category: 17: Outboard LE
Got all of the forward most rivets done. Was able to get them myself without too much trouble. Did a little QC of my work and found about five rivets total that weren't perfect. Drilled those out and replaced. Set it aside and going back to the right LE.

Got the top two rivets and the splice strip rivets all squeezed on the right LE.