Aug 10, 2022 4.0 21-2 to 21-5: Aileron work Category: 21: Aileron
Primed some aileron parts to pre-assemble brackets. I tied to take advantage of cooler weather as a storm passed but it was very humid and primer did t come out great. Lesson learned.

8/11: cleco'd left aileron together and predrilled the counterbalance holes. Took a minute to figure out what they were trying to have me do, but figured it out eventually. Removed the skin and cleco'd the counterbalance to the ribs and marked the other holes. Then upsized those holes to #27. Realized I'm going to need some new drill bits to get through this stainless steel. Bolted the counterbalance with the correct hardware. Reinstalled the skin and match drilled the leading edge holes in the counterbalance.

8/12: got right aileron to same condition as left. Setting aside for now to get back on tanks.