Deburred the remaining skins and spar for the right flap the. Prepped and primed.
10/10: started assembly of the flap bracket assemblies.
10/11: took advantage of my nephew in town and got a lot of work done this evening. Everything dimpled and started riveting the skeleton together.
10/13: finished the skeleton and got the leading edges and top skin cleco'd and set in the cradles.
10/15; got the top and bottom skins riveted and trailing edge taped and cleco'd to the board.
10/17: got it all back-riveted and finished of. Missing two pull rivets.
10/21: got two rivets from another builder. Right flap is done.