Project: Greg's_RV-10     -     Entry

Oct 08, 2023 1.5 33-2 thru 33-5: Baggage Area work Category: 33: Baggage Area
I had already jumped into Section 33 a bit as I was trying to figure out the access panels for the steps; now I'm going back through from the beginning to pick up the steps that I skipped. Fabricated the hinge for the seat backs and match drilled to the floor. Then cleco'd everything in place and started fitting the baggage door frame. Match drilled the holes into the baggage floor.

Installed the F-1924B baggage floor angles and noted that they cause yet another conflict with my step access holes. It's not bad, but just another little annoyance with those. I proceeded the cleco all of the access panels in place to see if it is really going to be feasible to remove and install these cover plates. It's not easy and the whole set up is a little wonky. I've been fighting all the little things with the setup, none are a deal breaker but the summation of small things I know I won't be happy with it. I'm going to bite the bullet and order new baggage floor pans and redo it. It's $100 - lesson learned.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.