Project: Greg's_RV-10     -     Entry

Feb 04, 2024 4.5 33-5 thru 33-8: Baggage floors Category: 33: Baggage Area
Picked up back in the baggage floor section now that AC components are routed and everything is set. Vacuumed everything out well and wiped it all down inside as it will get closed up. Sounds or checked some of the dimples and river call outs. I'm deviating a little from the plans on what is flush vs standard rivet.

Cleco'd the baggage floor and rear seat pans in place and started the rivets. Used my pneumatic pull rivet gun and everything went pretty quickly.

Riveted my modification to the side panel and temporarily installed it with the screws.

2/5: got some more work done this evening in the baggage floors. Squeezed all the solid rivets including all the nut plates in the baggage floors and rear bulkhead. Riveted the rear baggage door triangle parts and riveted the little clip angles. Was able to screw the bulkhead in place and all the screws aligned. Almost ready to cut it for the evaporator.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.