Project: JerAmyRV-10     -     Entry

Dec 24, 2021 1.5 Lots and Lots of Drilling and Cleco-ing Category: Empennage
With Amy on a 24hr shift today, I spent some time working on the HS-1002/1007/1008/1013 parts, primarily the effort was spent cleco-ing the assembly back together, drilling, cleaning, and then prepping for the machine counter sinks. (Which I'll do tomorrow)

No Pictures found for this entry