Project: JerAmyRV-10     -     Entry

Jul 30, 2023 1.5 Drilling Right Longeron and Starting Final Drilling of the tailcone side and bottom skins Category: Empennage
Did a repeat of the left side longeron and drilled out the right side longeron, then did the match-drilling for the F-1012 (at the rear of the tailcone), and then started the longish job of moving clecos around whilst final drilling all of the holes in the skins. I didn't get too far, so I'm noting where I've been in my build instructions (essentially doing the rows [stiffeners] first and then I'll come back and do the columns [bulkheads] after.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.