Jan 05, 2022 5 Left Window, Baggage Floor and VHF Antenna Category: Fuselage
Hysol'd in the left window frame parts today. Happy with the way these are turning out. One thing I learned from Brandon at the factory was if you dimple the rivet holes for the rivets, they sit a lot closer in to the frame (read less work fairing them in later). So I tried it on the left side and it's really an improvement. The rivets are very close to being really flush. I also Hysol'd in the upper VHF antenna mount. Once it gets set up I can proceed with installing the antenna into the vertical stab. I need to build a support for the RF connector to the antenna but want to do that with the antenna supported by the upper mount. While I was waiting for all this Hysol to dry, I fit the baggage floor, drilled the mounting holes in the boards and installed the rivnuts to secure the baggage floor. Big fan of rivnuts after using them on a couple old cars I have rebuilt and my Jeep. Never had one spin on me but I also use the same Loctite bearing lock (580 I think) when I press them. Doesn't take much and it seems to really let them take a bit of torque when I tighten in the screw/bolt.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.