Project: Geek     -     Entry

Feb 03, 2022 5 Wiring and Baggage Bag Category: Fuselage
Installed the baggage sack and baggage area floor boards. The floor boards are set into rivnuts which made getting it located and attached really easy. The plan is for my son (who sews climbing accessories and such) to install a zipper in the back section so later on I can easily access the back of the plane during inspections and such. I also installed the horizontal stab and elevator so that I could insure that my VHF antenna was clear of all the moving parts and start running the antenna cable. It also allowed me to figure out how I wanted to run my trim wiring from the motor towards the front of the plane. Got both to a point where I can now look how I want to run the wires along with some other items that I am installing (autopilot servos, transponder, trim booster and such). Where I spot tied the cables to the frame, I wrapped the frame at that point with silicone tape. Started working on the roll trim servo install by fabricating the bracket and getting the aluminum parts primed.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.