Project: Geek     -     Entry

Sep 04, 2022 17 Left Side, Horiz Stab and Strut Cover Category: Fuselage
I completed covering the left side and left half of the top of the fuselage along with the right landing gear strut and the bottom of the horiz stab. I think I am about half way done now. I have read other logs where builders are happy when done with the covering. You may count me as being among that group. With the left side done, I will be installing the static ports since it will be easier to put the left one in and fit/cut the tube for the right side without the right skin installed. Also going to install the baggage sack and mark off where I want to install the zippers in the back of it to gain easy access behind. My transponder and trim controls are back behind it so I want it to be easy access.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.