Project: BroxyRV14     -     Entry

Jul 30, 2021 1 Rear spar doubler, rivet to spar Category: HStab +Elevators
36 rivets using my rivet gun for the first time, after first batch I drilled out and replaced two but overall very happy with gun and bucking bar control


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.