EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
BroxyRV14
- Entry
Date:
Aug 30, 2022
Hours:
1
S25 - F1404 center section
Category: Fuselage
Description:
Assembled and double flush rivetted the bearing bracket assemblies that attach to the forward bulkhead, part of control system? Has to slightly trim the rivets to get both sides flush as required.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.