Apr 06, 2023 1.5 S29 - Forward fuselage fitout Category: Fwd Fuselage
Had missed tightening some of the rib attachment bolts which have now all been done then worked on the left side bulkhead plate and matchdrilled the upper drag fitting, both primed and ready to be fitted. They rivet onto the skin so are only clecoed in at this stage.