Project: Heath     -     Entry

Apr 19, 2023 6 More prepping for covering Category: Covering
Finished stripping struts and they are ready for sand blasting and powder coating. Removed wing strut attach brackets for sand blasting and powder coating. Pressure tested fuel tank at 3psi overnight and ready for installation. Installed inter rib bracing on left wing.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.